SALES CONTRACT
SALES CONTRACT (ORIGINAL)
Contract No.:CE102 Date: January 5,2005 Signed at: Calcutta
Sellers: China Qingdao Haier cooperation
Address: Qingdao Haier Road No. 1 Haier Industrial Park,China
Tel: (086)4006999999 Fax::(086)532-88935384 E-mail:
Buyers: Indian BDF Import and Export Corporation
This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:
Name of Commodity:20L--17℃ Constant temperature refrigerator. Specification: BCD-239SA
Size of Commdity: 350(Length)*300(Width)*450(Heigth)mm
Net Capacity:20L
Net Weight:10kg
Gross Weight:11kg
Voltage Standard:220/50V/Hz
Input Power:220/50V/Hz
Consumed Power:55W
Temperature Range:0.6KW.h/24h
Color:White
Quantity:1000
Unit Price:RMB 2473.00(Two thousand and four hunderd seventy-three yuan) per ∕CIF Calcutta
Total Value:RMB 2473000.00(Two million and four hunderd seventy-three thousand yuan only)。
The trade terms to this contract shall be governed and construed under and by the latest.
With 10% More or less of shipment allowed all the sellers’ option
5 Shipping Marks:To be designated by the Sellers
6 Insurance:
Covering __all risks and war___ Risks for______110% of Invoice Value to be effected by the _____buyer_______.
7. Port of shipping:Qingdao, partial shipments are allowed
8 Port of destination: Calcutta, transshipment is allowed
9 Time of Shipment:During February,2005
10 Terms of Payment:
By Confirmed, Irrevocable, Transferable and Divisible L/C to be available by sight draft to reach the Seller before ______ and to remain valid for negotiation in China until ______after the Time of Shipment. The L/C must specify that transshipment and partial shipments are allowed.
The Buyer shall establish a Letter of Credit before the above-stipulated time, failing which, the Seller shall have the right to rescind this Contract upon the arrival of the notice at Buyer or to accept whole or part of this Contract non fulfilled by the Buyer, or to lodge a claim for the direct losses sustained, if any.
11.Commodity Inspection: It is mutually agreed that the Certificate of Quality and Weight issued by the China Entry-Exit Inspection and Quarantine Bureau at the port of shipment shall be taken as the basis of delivery.9,
12. Quality/Quantity discrepancy:
In case of quality discrepancy, claim should be filed by the Buyer within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy, claim should be filed by the Buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable for any discrepancy of the goods shipped due to causes for which the Insurance Company, Shipping Company, other Transportation Organization /or Post Office are liable.
13 Claims:
Within 45 days after the arrival of the goods at the destination, should the quality, Specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable, the Buyers shall, have the right on the strength of the inspection certificate issued by the C.C.I.C and the relative documents to claim for compensation to the Sellers 14 Force Majeure :
The sellers shall not be held responsible for the delay in shipment or
non-deli-very of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The sellers shall advise the Buyers immediately of the occurrence mentioned above the within fourteen days there after . the Sellers shall send by airmail to the Buyers for their acceptance a certificate of the accident. Under such circumstances the Sellers, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods.
15 Arbitration :
All disputes in connection with the execution of this Contract shall be settled friendly through negotiation. in case no settlement can be reached, the case then may be submitted for arbitration to the Arbitration Commission of the China Council for the Promotion of International Trade in accordance with the Provisional Rules of Procedure promulgated by the said Arbitration Commission . the Arbitration committee shall be final and binding upon both parties. and the Arbitration fee shall be borne by the losing parties.
16 Governing Law; This Contract shall be governed by the United Nations
Convention on Contracts for the International Sale of Goods.
The Buyer: The Seller:
Company Name: Company Name:
India BDF Import and Export Coporation China Haire Corporation
Signature: Signature:
Print Name: Asan Yin Print Name: Great Zhonghua
Date: Date:
第二篇:签订售货合同
签订售货合同
(一)背景资料
日本高田商社收到方方小姐的建立业务关系电函后,愿意成为贸易合作伙伴,双方就全棉色织T恤衫进行交易磋商。
(二)工作内容
1.询盘
2.发盘
3.还盘
4.接受