8d report8D报告范例

时间:2024.4.27

D1: Establish your required team that should be cross functional to cover all the required departmental involvement.

Our D1 included representatives from QC, engineering, projects, manufacturing and purchasing.

D2: Problem Description

Moulded Parts showing unacceptable level of damage around top edge of surrounding lip due to thermal exposure. We included photos of the problem for effective illustration

D3: Interim Containment Action

1. The customer has had a 100% inspection for the parts and quarantined those parts found to be defective.

2. Manufacturing site has had a 100% inspection for the all parts in stock, and quarantined any defective parts found

D4: Root Cause Analysis

In trying to rectify a different issue the moulding parameters were adjusted which lead to increased shrinking. The part being slightly smaller has meant that the subsequent process now damages the part.

Plus an ineffective operator training and instructions on containment station meant that the issue was not picked up and non conforming parts have been allowed to get to the customer.

D5: Implement PCA (Permanent Corrective Action)

Adjust mould parameters to tightly control part shrinkage. Implement increased inspection and SPC for parts overall size. Monitor and record.

Implement 100% inspection at subsequent operation where damage has occurred

Implement appriate controls and improved operator training for containment actions

D6: Implement and Validate PCA

State the date the PCA has been implemented.

Validation of the PCA is in the form of analysis of the SPC data to check part variation

(shrinkage level) and inspection of the containment records to check to see if the issue has been noted again.

D7: Prevent Re-occurrence

We have simply maintained controls implemented for PCA but decreased inspection frequency on the control plan

D8: Final Team Discussion / Review

Review of the data collected during PCA and investigation of ways that this kind of error can be avoided in the future. PFMEA updated in line with this for use when similar products are reviewed during the product realisation process.

Long term process capability studies maintained for all products

This probably is not the best example in the world, and I do like the previous form posted earlier on this thread. We do need to implement improvements to our approach which I hope may come of me posting this. However I hope this gives you a start. I would recommend being a bit more detailed in your approach.


第二篇:8D报告示例


地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋 总机 :(+86)755-29886000 传真 :(+86)755 29886360 Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋 总机 :(+86)755-29886000 传真 :(+86)755 29886360 Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋

总机 :(+86)755-29886000 传真 :(+86)755 29886360

Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋 总机 :(+86)755-29886000 传真 :(+86)755 29886360 Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋

总机 :(+86)755-29886000 传真 :(+86)755 29886360

Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋 总机 :(+86)755-29886000 传真 :(+86)755 29886360 Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

地址:深圳市宝安区公明镇马山头元灯坑旭发科技园 B3栋

总机 :(+86)755-29886000 传真 :(+86)755 29886360

Website: E-mail: dixian@dixian.net

8D报告示例

8D报告示例

QR-QA-008-B0

拟制:陈龙 审核:肖进城

更多相关推荐:
8D报告实例

8D报告8DconcernAnalysisReportD1UseTeamApproach主題選定及團隊形成H8848档位漏水原因及处理办法团队生产线主管PIE工程师QC工程师注塑主管D2DescribeTheP...

案例:8D报告(纠正预防措施)的写法

案例8D报告纠正预防措施的写法案例以下通过一件发生在我们身边的平常小事来说明8D报告纠正预防措施的写法事由出租屋内一日早晨小王正在水龙边洗脸准备上班刚洗完脸突然家中打来电话于是把脸帕一挂就去屋内接电话接完电话就...

8D质量报告案例

XxxElectronicsCO.,LTD.CorrectiveActionReport(8Disciplines)改善措施報告(8D)

8D报告(范本)

改善行动报告8D1问题解决小组组成日期41820xx事业部部长品质部部长生产部部长技术科经理VGS线产品工程师2问题描述21问题陈述客户投诉4个产品短路3临时性纠正措施31库存在制品检查1对在制品进行抽样测试I...

8D报告案例

供应商质量问题纠正措施通知单2以上各项内容均需填写详细空间不足可用附件并在每个步骤备注凡措施中有加严加强等笼统描述内容均视为回复无效

8D报告范例

SupplierCorrectiveActionReportIssueddate報告日期:Dec.27th,2006Issuedby報告人:##2.1.DefectDescription不良描述:NE2000/…

8D报告样本

8D报告8D报告

福特8D报告示例(中英文)

供应商A8D问题分析报告SupplierA8DConcernAnalysisReport

8D报告范例

8D报告范例8Disciplines8DCorrectiveorPreventiveActionReportampd66S1k4S06C39hq39E2aToDavidBeaversBenchmarkRefer...

一个8D报告的实例(英文)

一个8D报告的实例英文1FormtheTeamDateStartedSep2220xxInternalteammemberABCExternalteammemberNA2DescribetheProblemOn...

某汽车零部件有限公司空压机漏油8D整改报告案例(模板)

某汽车零部件有限公司空压机漏油8D整改报告案例(模板),内容附图。

检索报告作业实例

本科课程考查专用封面作业题目信息检索课程报告所修课程名称信息检索修课程时间20xx年10月至20xx年1月完成作业日期课程结束后一周内评阅成绩评阅教师签名20xx年1月日我选择的检索课题是为会计从业资格考试收集...

8d报告范例(45篇)