XX视频监控系统工程验收报告

时间:2024.3.31

***

视频监控系统工程

验收报告

   ***

***


目  录

工程概况. 1

工程设计说明. 2

系功统能说明. 11

小区监控设备/构配件/材料清单. 12

竣工结算报告. 14

表1  安防工程竣工报告. 15

表2  检验报告. 16

表3 施工质量抽查验收..........................................17

培训记录表. 18

系统试运行记录. 19

竣工图纸. 20

表4  技术验收. 22

表5  资料审查. 23

表6  验收结论汇总. 24

表7  参加工程验收主要人员名单. 25

附件一:           售后服务条款. 26

附件二:            合格证记录... 28


***

视频监控系统工程验收表

系统(工程)名称:***视频监控系统工程

系统(工程)级别:机电安装工程一等                     

建设(使用)单位:***                           

设 计、施 工单位:***

负     责     人:                                      

地            址:                                     

电            话:                                     

邮   政   编  码:                                     

验   收   日  期:                               

说明:1、本表由设计施工单位填报。

        2、“文件资料”栏,如持有材料,在相应括号打“√”,否则打“×”,并附上原材料(复印件)。


工程概况


工程设计说明

1、设计标准

视频监控系统的建设依据国家相关法律法规、行业标准、省公安厅技防办相关要求等资料进行规划设计,具体如下:

(1)安防视频监控系统设计方面:

《中华人民共和国公安部行业标准》(GA70-94)

《视频安防监控系统技术要求》(GA/T367-2001)

《民用闭路监视电视系统工程技术规范》(GB50198-94)

《工业电视系统工程设计规范》(GBJ115-87)

《安全防范系统通用图形符号》(GA/T75-2000)

(2)视频监控图像质量方面:

《电视视频通道测试方法》(GB3659-83)

《彩色电视图像质量主观评价方法》(GB7401-1987)

(3)视频系统网络设计方面:

《信息技术开放系统互连网络层安全协议》(GB/T 17963)

《计算机信息系统安全》(GA 216.1-1999)

《计算机软件开发规范》(GB8566-88)

(4)视频系统工程建设方面

《安全防范工程程序与要求》(GA/T75-94)

《安全防范工程技术规范》(GB 50348-2004)

《电子计算机机房设计规范》(GB50174-93)

《建筑物防雷设计规范》(GB50057-94)

《建筑物电子信息系统防雷技术规范》(GB50343-2004)

《安全防范系统雷电浪涌防护技术要求》(GA/T670-2006)

《民用建筑电气设计规范》(JGJ/T16-92)

(5)视频系统工程验收方面:

《安全防范系统验收规则》(GA308/2001)

《中国电气装置安装工程施工及验收规范》(GBJ232-90.92)

《建筑与建筑群综合布线系统工程验收规范》 (GB/T50312-2000)

2、设计原则

视频监控系统的建设以“统一规划、分步实施、统一标准、技术先进、突出应用、稳定可靠、资源共享”为原则,确保系统的设计和建设满足住宅园区管理的全局需求,体现物业安保管理的数字化、自动化和智能化的领先水平。

(1)统一标准

视频监控系统的建设必须统一标准,系统建设在符合国家和行业相关标准及地方标准的建设要求基础上,采用先进的技术手段和系统架构,在同一的标准框架下实现统一部署、资源共享、平台共用,构建全网各种设备接入、各子系统互联互通、区域视频信息系统互联共享的可扩展规模和升级应用的视频信息管理系统;系统选择的产品已根据安全生产的技术要求和国家安全标准进行独立设计,完全可以满足安全监测的自动化和信息化管理要求。

(2)分步实施

视频监控系统的规划不仅满足过去系统的接入还考虑将来不同时期建设的兼容。

(3)统一规划

视频监控系统的建设必须统一规划统一要求和部署,采用高科技、新方法对生活园区管理进行综合分析,提高现场管理水平和运行效率,增强应对盗抢及破坏事件的应急能力。

(4)技术先进

采用主流的、先进的技术构建系统平台,满足可视化监控需要,具有先进的数字化、自动化和智能化技术水平,实现“指挥点对点可视化、系统运行数字化、应对决策扁平化”,使小区可视化管理、应急指挥水平进入全市的先进行列。

(5)稳定可靠

视频监控系统的建设不是各种视频资源的简单组合,而是统一标准构架下的有机组成,系统采用的软硬件根据统一的规范、协议和要求选型,根据最新的标准规范,并经过具有相应资格的软件评测中心、产品检测中心的测试,质量达标,性能稳定,能够持续有效运行,满足城市管理7*24小时不间断持续运行的需要。

3、监控系统设计

(1)数字视频监控系统达到的功能

按照以上标准及原则建立的数字视频监控系统,可以达到以下主要功能:

① 音视频采集:

前端监控点系统通过摄像机、拾音器进行音视频信号的采集。选用不同的摄像机可以达到全方位实时监控、调用预置位、在指定的预置点之间进行巡航、控制辅助灯光设备等功能。

② 音视频压缩:

前端的模拟摄像机、拾音器采集的音视频信号经过嵌入式硬盘录像机转变为数字音视频信号存储在本地硬盘上,并通过网络接口传送到监控中心和远程监控终端。

③ 录像集中存储:

采用磁盘阵列进行集中存储,采用RAID模式,增强录像文件的安全性;文件记录有六种模式:定时录像、手动录像、移动检测录像、报警录像、移动侦测录像&报警录像、移动侦测录像|报警录像,其中报警录像可设置提前预录时间和报警停止。

④ 云镜控制:

嵌入式硬盘录像机自带RS-485接口,内置云台、快球控制协议,可接多种型号的云台解码器、一体机和快球,可在本地和远程进行云镜控制、预置位的设置和调用、自动巡航等操作。

⑤ 网络传输:

嵌入式硬盘录像机自带10M/100M自适应网络接口,支持TCP/IP协议(支持ARP、RARP、IP、TCP、PPP、PPPOE、DHCP、SNMP等等);支持组播,支持宽带拨号上网(PPPOE);可以使用应用软件或浏览器通过网络设置参数、实时浏览任何一路或多达十六路的视频和音频信号、查看; 远程下载或实时查看录像文件等操作。

(2)前端设计

根据实际需求,将整个住宅区划分为两个监控区域进行监控,即地面园区监控区和地下停车场监控区。详细设计如下两图所示:


系统监控点监控信息汇总表

3)信号传输设计

为了保证监控数据的稳定、高效传输,也为了使园区内的所有监控线路的使用寿命更长久,在施工时,采取全线路穿管操作。在地面的监控线缆均埋藏于地底,即隐蔽又能很好的起到屏蔽干扰的作用。而地下停车场的线缆,在铺设时均沿着梁柱间的角落走线,有一定的隐蔽性。

视频线与电源线采用不同的PVC管穿线,这样就能降低电源线对视频线传输数据的干扰了。

(4)监控中心

对监控中心的设计示意图如下图所示:

终上所述,对整个园区的监控系统做出如下设计:


系功统能说明

1、全天候、全方位监视功能

前端安装彩色黑白自动转换SONY芯片的红外摄像机,并对小区入口及停车场入口两处重要场所配置道路监控一体机,这样不论在白天、晚上,或是恶劣天气,均能在监控中心清晰地观察进出园区的所有车辆及行人的具体信息情况。可在监控中心控制台上以1/4/9/16画面等分割模式进行监控。

2、实时录像

对所有监控点进行全天24小时实时录像,按高清CIF格式保存,保存1个月,也可按预设方案进行录像。

3、录像回放功能

回放本地录像,支持时间点连续回放和单录像文件回放,对监控情况实行有效追溯。

4、报警对讲

对重要区域实现有人移动侦测报警,报警后自动将前端图像大画面到监控中心控制台。

5、远程监控

如有实际需求,可将监控中心与Internet网络相连,这样便可在园区内任一个能连广域网的电脑中,通过客户端和管理员身份来监看前端现场图像、回放录像和控制道路监控一体机,客户端支持C/S和B/S两种方式进行访问。


小区监控设备/构配件/材料清单

工程名称:***

工程建设区段或地点:***

说明:进场设备/构配件/材料清单须与合同一致。

甲方签字:                       乙方签字:     

日    期:      年   月   日     日    期:     年   月   日


竣工结算报告

工程名称:视频监控系统工程

建设单位:技防分公司

建设单位代表:                          施工单位代表:

年    月    日                       年    月   日


表1  安防工程竣工报告

说明:本表由设计施工单位填报,复印件报、建设单位。


表2  检验报告



培训记录表

培训人员签字:                           培训人:

日期:      年   月   日


系统试运行记录

注:1、系统试运行情况栏中,正常的打“√”,并每天不少于填写一次;不正常的在备注栏内及时扼要说明情况(包括修复日期)。

2、系统有报警部分的,报警试验每天进行一次。出现误报警、漏报警,在试运行情况和备注栏内如实填写。


竣工图纸

因整套施工方案都是按照最初的设计要求来进行的,所以,竣工图纸也就是以下两张设计示意图。


表4  技术验收

表5  资料审查


表6  验收结论汇总

表7  参加工程验收主要人员名单


附件一:           售后服务条款

本着为项目服务,并以本项目利益指导思想原则,严格执行合同协议的有关规定,响应一切以本项目为出发点,满足系统的技术要求、方便运行管理。公司以“客户满意不低于99%”为质量目标,严把售后服务质量关,竭诚为客户朋友提供优质服务。

通过厂家、设计、施工、验收、维护和项目共同努力,进行全方位的、统一的、科学的、规范化的管理和工程商的及时、高效的技术支持服务。

1、服务期限

从工程验收合格之日起,保修期为1年。

2、服务费用

(1)质保期内

对所有设备的所有配件无条件免费保修及更换,所有设备的所有配件(包括整机所有部件)的维修及部件费均为免费,并提供定期上门清洁、检测系统设备的服务。

保修期内,所有设备维修保养服务均为上门服务,由此产生的费用均不再收取。

(2)质保期外

保修期过后不得拒绝甲方的提供有偿服务的要求,具体费用等应在施工合同中明确。

3、保修联系方式

为用户提供免费的系统技术咨询,详细解答用户对系统工程中的任何一个问题,做到“有问必答、有答必详”。使用者在使用过程中如发现不能自行解决的问题,可直接用电话,传真,互联网,书信等方式取得联系(其中电话为24小时服务),将在1个工作日内作出响应,与使用者协商解决问题。

4、服务响应时间

我们承诺保修期内定期对各系统的运行情况进行全面巡查,发现问题当场解决,保障各系统正常高效运行。

在质保期内,现场服务响应时间为2小时,当系统运行确实发生现场技术人员无法排除的故障,通知后采取应急措施,将在4个小时内,派遣具有故障排除技能的工程服务人员赶到现场进行维修,如发生硬件故障,将在一个工作日内更换备件。

质保期内,一个工作日无法修复的设备,承诺在下一个工作日内提供不低于故障设备规格性能的备用设备供项目单位使用,直至故障设备修复。

根据业主的运行管理模式,结合本工程系统需要进行维护保养的内容,为业主量身定做一套切实可行的维护保养表,对业主的使用和管理人员进行保养指导,并将业主反馈的维护保养记录进行详细的分析,及时发现问题,做到防患于未然,保证系统能安全正常地运行。


附件二:            合格证记录

Editor's note: Judson Jones is a meteorologist, journalist and photographer. He has freelanced with CNN for four years, covering severe weather from tornadoes to typhoons. Follow him on Twitter: @jnjonesjr

(CNN) -- I will always wonder what it was like to huddle around a shortwave radio and through the crackling static from space hear the faint beeps of the world's first satellite -- Sputnik. I also missed watching Neil Armstrong step foot on the moon and the first space shuttle take off for the stars. Those events were way before my time.

As a kid, I was fascinated with what goes on in the sky, and when NASA pulled the plug on the shuttle program I was heartbroken. Yet the privatized space race has renewed my childhood dreams to reach for the stars.

As a meteorologist, I've still seen many important weather and space events, but right now, if you were sitting next to me, you'd hear my foot tapping rapidly under my desk. I'm anxious for the next one: a space capsule hanging from a crane in the New Mexico desert.

It's like the set for a George Lucas movie floating to the edge of space.

You and I will have the chance to watch a man take a leap into an unimaginable free fall from the edge of space -- live.

Watch this video

The (lack of) air up there

Watch this video

Watch man jump from 96,000 feet

Tuesday, I sat at work glued to the live stream of the Red Bull Stratos Mission. I watched the balloons positioned at different altitudes in the sky to test the winds, knowing that if they would just line up in a vertical straight line "we" would be go for launch.

I feel this mission was created for me because I am also a journalist and a photographer, but above all I live for taking a leap of faith -- the feeling of pushing the envelope into uncharted territory.

The guy who is going to do this, Felix Baumgartner, must have that same feeling, at a level I will never reach. However, it did not stop me from feeling his pain when a gust of swirling wind kicked up and twisted the partially filled balloon that would take him to the upper end of our atmosphere. As soon as the 40-acre balloon, with skin no thicker than a dry cleaning bag, scraped the ground I knew it was over.

How claustrophobia almost grounded supersonic skydiver

With each twist, you could see the wrinkles of disappointment on the face of the current record holder and "capcom" (capsule communications), Col. Joe Kittinger. He hung his head low in mission control as he told Baumgartner the disappointing news: Mission aborted.

The supersonic descent could happen as early as Sunday.

The weather plays an important role in this mission. Starting at the ground, conditions have to be very calm -- winds less than 2 mph, with no precipitation or humidity and limited cloud cover. The balloon, with capsule attached, will move through the lower level of the atmosphere (the troposphere) where our day-to-day weather lives. It will climb higher than the tip of Mount Everest (5.5 miles/8.85 kilometers), drifting even higher than the cruising altitude of commercial airliners (5.6 miles/9.17 kilometers) and into the stratosphere. As he crosses the boundary layer (called the tropopause), he can expect a lot of turbulence.

The balloon will slowly drift to the edge of space at 120,000 feet (22.7 miles/36.53 kilometers). Here, "Fearless Felix" will unclip. He will roll back the door.

Then, I would assume, he will slowly step out onto something resembling an Olympic diving platform.

Below, the Earth becomes the concrete bottom of a swimming pool that he wants to land on, but not too hard. Still, he'll be traveling fast, so despite the distance, it will not be like diving into the deep end of a pool. It will be like he is diving into the shallow end.

Skydiver preps for the big jump

When he jumps, he is expected to reach the speed of sound -- 690 mph (1,110 kph) -- in less than 40 seconds. Like hitting the top of the water, he will begin to slow as he approaches the more dense air closer to Earth. But this will not be enough to stop him completely.

If he goes too fast or spins out of control, he has a stabilization parachute that can be deployed to slow him down. His team hopes it's not needed. Instead, he plans to deploy his 270-square-foot (25-square-meter) main chute at an altitude of around 5,000 feet (1,524 meters).

In order to deploy this chute successfully, he will have to slow to 172 mph (277 kph). He will have a reserve parachute that will open automatically if he loses consciousness at mach speeds.

Even if everything goes as planned, it won't. Baumgartner still will free fall at a speed that would cause you and me to pass out, and no parachute is guaranteed to work higher than 25,000 feet (7,620 meters).

It might not be the moon, but Kittinger free fell from 102,800 feet in 1960 -- at the dawn of an infamous space race that captured the hearts of many. Baumgartner will attempt to break that record, a feat that boggles the mind. This is one of those monumental moments I will always remember, because there is no way I'd miss this.

更多相关推荐:
监控工程验收报告表模板1

XXXXXXX中医医院电视监控系统工程验收资料XXXXXXX通信有限公司XXXXX年4月1日XXXXXX通信有限公司系统工程名称XXXXXX中医医院网络系统监控设备建设使用单位XXXXXX中医医院设计施工单位X...

监控监控验收报告文本范本

监控系统工程验收文档建设工程验收单位名称日期富阳众盟计算机网络分公司20xx年10月31日1竣工文件目录一工程说明3二系统拓扑图4三工程联系单5四原设备器材清单6五监控工程竣工验收单7六工程整改联络单9七工程验...

安防监控工程竣工验收报告

小浪底大坝中部区等区域安装监控设备项目验收报告系统工程名称建设使用单位设计施工单位验收日期小浪底大坝中部区等区域安装监控设备项目20xx年9月20日1施工质量抽查验收项目名称小浪底大坝中部区等区域安装监控设备项...

安防监控工程竣工验收报告样本

安防监控工程竣工验收报告样本智能监控系统工程验收表系统工程名称道路智能交通监控工程系统工程级别建设使用单位xx交巡警大队设计施工单位深圳市虎将科技有限公司验收日期年月日表1系统试运行记录日期时间系统运行情况含误...

安防监控工程竣工验收报告

中道国际门禁指示灯系统工程竣工验收报告系统工程名称中道国际门禁指示灯系统建设使用单位中道国际设计施工单位邯郸市亚特尔计算机有限公司验收日期20xx年9月25日一项目概况根据合同要求按照公安部安全防范工程程序与要...

监控工程验收报告表模板1

兰泰物业管理公司网络监控系统工程验收资料兰州安视达网络有限公司20xx年2月25日兰州安视达网络有限公司系统工程名称兰泰办公楼网络监控系统建设使用单位兰泰物业管理公司设计施工单位兰州安视达网络有限公司验收日期监...

监控工程验收报告表模板1

XXXXXXXXXXXXXXXXXXX监控系统工程验收资料XXXXXXXXXXXXXXX公司监控工程竣工验收报告工程名称建设单位设计施工单位XXXXXXXXXXXXXX视频监控系统施工质量验收XXXXXXXXX...

东亭社区居委会监控工程验收报告

东亭社区居委会监控工程验收报告工程名称苏州工业园区唯亭街道东亭居委会楼道监控工程分项安防监控系统编号20xx1108

监控系统工程竣工初验报告

监控系统工程竣工初验报告

电影院监控工程竣工验收报告单

工程竣工验收报告单工程名称翼城时代广场电影院监控及音响安装合同

妇保院安防监控工程竣工验收报告

监控系统工程竣工验收报告系统工程名称绍兴市妇幼保健院监控系统建设使用单位绍兴市妇幼保健院施工单位绍兴冠群信息技术有限公司验收日期年月日一项目概况根据合同要求按照公安部安全防范工程程序与要求完成了对系统现场勘察初...

监控候考大楼工程竣工验收申请报告

监控候考大楼工程竣工验收申请报告致湘西平安机动车驾驶人考试中心项目建设有限公司我司承建的湘西自治州机动车驾驶人考试中心监控候考大楼工程该单位工程的基础分部和主体分部工程已经参建各方验收合格其它分部工程已按合同约...

监控工程验收报告范本(21篇)