检 验 报 告
TEST REPORT
检 验 报 告
报告编号(No. of Report):X8112502-0507BW-Z01 第1页 共2页
检 验 报 告
报告编号(No. of Report):X8112502-0507BW-Z01 第2页 共2页
注意事项
1. 报告无我单位“检验报告专用章”或无批准、审核、主检人签字无效。
2. 报告复印件未重新加盖我单位“检验报告专用章”或有任何涂改无效。
3. 一般情况,委托检验仅对来样负责。
4. 对本报告若有异议,请于收到检验报告之日起十五日内,向我单位或上级主管部门提出,逾期不予受理。
5. 收到本报告一个月内,可凭我单位检验委托单领取样品,否则,按我单位规定予以处理。
Notice
1. The report is invalid without “The Special Stamp for Test Report”, and without the signatures of approval, verification and chief test.
2. The copy report is invalid without “The Special Stamp for Test Report” and it is invalid if it is altered.
3. The test commission is only responsible for the submitted samples.
4. If you have any question on the reports, please demur to our unit, to the superior department which decided the inspection within 15 days after receiving the test report.
5. You can come to our unit to take the sample back within 30 days since you get the report. Or our unit will have the right to deal with the sample according to the regulation of our unit.
地址:南昌市高新区高新二路 Address:2nd GaoXin Road ,High-tech District, Nanchang
邮编:330069 Postal Code:330069
电话:(0791)8169673,8285796 Telephone:(0791)8169673,8285796
传真:(0791)8160065 Fax:(0791)8160065
电子信箱:jxgxjc@163.com E-mail:jxgxjc@163.com
第二篇:预拌砂浆检测报告
山东 质量检测有限责任公司
普通干混砂浆检测报告
鲁建检字第 号 LKJC116 共 1页 第1页
批准: 校核: 主检: 检测单位:(盖章)
签发日期:2012.11.20