Abstract—As the total station trigonometric leveling can survey without the restrictions of topography. So, we can use it to survey the third & fourth order level survey in some special areas. In this article, we propose a new total station measuring method from combining the defect of traditional measurement methods. The advantages of this method is that it can improve the precision without measuring height of device and prism, and it can replace the third and fourth level of measurement under certain conditions. This method can greatly improve efficiency and shorten the project duration in the construction survey.

Keywords- trigonometric leveling;total station;error analysis

                                                                                                                                                       I.           Introduction

Engineering construction often relates to height measurement. The traditional measurement methods are leveling surveying and trigonometry trigonometric leveling. Although the two methods have their own characteristics, but there are shortcomings. With the widespread use of the Total Station and using the track rod with the total station method to measure the elevation of the increasingly popular, traditional trigonometric leveling method has shown its limitations. After a long journey, a new trigonometric leveling method has been summed up. This approach combines the advantages of two traditional approaches to further improve the accuracy of the trigonometric leveling and to survey faster.

This article systematically expounds the principle of traditional trigonometric leveling methods and the new methods, compares their advantages and disadvantages, and analyses the main errors and measurement accuracy in the process of trigonometric leveling.

                                                             II.         Principle of Traditional Trigonometric Leveling and the New Method

The basic formula of the traditional trigonometric leveling:

                                                 (1)

where  is the elevation of a known point,  is the elevation of the unknown point, D is the horizontal distance between the two points,  is the vertical angle when observe from point A to point B,  is instrument height, t is the height of the prism.

For traditional methods, total station must be set up in the known elevation point. At the same time, you must measure out the height of both the instrument and the prism if you want to measure the elevation of the unknown points.

If we can measure the elevation of the measured point while set point of total station arbitrarily like leveling surveying, instead of set it on a known elevation point, and do not measure out instrument and prism, speed of measurement will be faster. As shown in the figure 1, assuming that the elevation of the point A is known, the elevation of the point B is unknown, here we measure the elevation of other points by total station.

Figure 1. Diagram for trigonometric leveling

Firstly, seen by trigonometric leveling principle:

                                            (2)

where i, t is unknown, but one thing is sure that once the instrument set, value of i ??will remain unchanged. At the same time choose tracking lever as a reflecting prism, assume that the value of t is also fixed. Seen from formula (2),

                                                (3)

By formula (3), the value of W will remain unchanged in any station. And while both  and are known, it is possible to calculate the value of W.

Operation of this new method is as follows:

Shown in Figure 2, elevation of point A is known, elevation of point B is unknown, and the instrument is set up at point C between A and B. The instruments sight point A to get the reading . That  =, and calculate the value of W, W = +. At this time related constants such as elevation of station, instrument height and prism height can be of any value, not necessary to set before measuring.

And then set elevation of point C to W, set the instrument height and prism height to 0. Then elevation of point C is known. Finally sight the target point B and measured its elevation, that is

                                                                      (4)

Therefore, using the new method, elevation of point B is

                                             (5)

Figure 2.  Diagram for the new method

In summary, with the total station set at any point, at the same time, not measuring the instrument height and prism height, we are still able to measure the elevation of the points to be measured. And theoretically, the results can have higher precision than using traditional trigonometric leveling.  Because it cuts down the sources of error. It is worth to note that, while in the actual measurement, the prism height can also be changed according to the actual situation. If the change of value of t can be recorded, we can calculate the elevation of the points to be measured on the basis of measurements.

                                                                                                 III.        Accuracy Control of Trigonometric Leveling

Using the new method of trigonometric leveling do not need to measure the instrument height and prism height, thus simplifying the measurement steps, and at the same time, reducing the sources of error, improving the observation precision.

2.1 Accuracy Analysis

Known from the above, the elevation difference between the point A and the unknown elevation point B is

                                                 (6)

Accuracy analysis below, for ease of differential, formula (6) becomes

                                                    (7)

, are the slant range between the instrument and prisms, as shown in figure 3.

Figure 3.  Accuracy analysis of new trigonometric leveling method

Total differential of formula (7):

                  (8)

The first is the height difference error caused by ranging error, while the second is the height difference error caused by vertical angle error, which, D1, D2 are the foresight and the backsight. According to the variance-covariance propagation law, the formula (8) is converted into the formula of mean square error of elevation difference:

           (9)

The line of sight close to equal before and after surveying process, meanwhile, if we keep the vertical angle unchanged, then we can assume  , formula (9) can be simplified as below:

                                                   (10)

Taking round trip measurement, mean square error of square number of height difference for one station is

                                                                           (11)

By formula of total error on leveling

                                                                  (12)

Total mean square error per kilometer

                                                                  (13)

where L is the range sum of foresight and backsight.

2.2 Accuracy Estimation

Following take total station which is frequently used in the engineering (nominal accuracy: angle ± 2 ", rang 2 mm ± 2 ppm) as an example. Estimating the accuracy of errors caused by direction and angle measurement, and accuracy of mean square error of height difference, the results are shown in Table 1, Table 2 and Table 3.

As can be seen from the above analysis and calculation in the table, the error of  height difference and error caused by vertical angle measurement approximated by a linear relationship. Taking double of mean error in Table 3.3 as the limit of the height difference measurement, taking the vertical angle of less than 25 °, meanwhile, line-of-sight being no more than 700m, comparing error per kilometer height difference with the level of third-class geometric allowed:

The result can meet the requirements of the Third Order Leveling. Under certain circumstances, this new method of leveling can take the place of Three & Four Order Leveling, particularly in the hills and mountains.

TABLE I.             Error Caused by Vertical Angle Measurement

TABLE II.           Error Caused by Range Measurement

TABLE III.         Mean Square Error of Height Difference

                                                                                                                                                        IV.        Conclusion

By analysing the new method of trigonometric leveling and its error, we come to the following conclusions:

1)       Using the new method of trigonometric leveling, we can set the stations at any point, without measuring instrument height and prism height, thus surveying faster.

2)       The new method does not require measuring instrument and prism height, so as to reduce the sources of error and improve accuracy.

3)       During observation, total station is placed in the middle. So it can effectively weaken or eliminate the curvature of the earth and atmospheric refraction, and, further improve the accuracy.

4)       Using the new method of trigonometric leveling, we can set the stations at any point, and at the same time we can observe without terrain restrictions, for which it’s particularly suitable for surveying and mapping in the hilly and mountainous areas. Under certain conditions, it can take the place of Three & Four Order Leveling to improve the operating efficiency of observation.

 
Acknowledgment

First and foremost, I would like to show my deepest gratitude to my supervisor, Dr. Huang, who has provided me with valuable guidance in every stage of the writing of this thesis.

I shall extend my thanks to Mrs. Yin for all her kindness and help. I would also like to thank all my teachers who have helped me to develop the fundamental and essential academic competence.

Last but not least, I' d like to thank all my friends, especially my three lovely roommates, for their encouragement and support.

References

[1]     Guo Z H, Zheng J F (2004) A study of formula err or on EDM trigonometric leveling. Belletin of Surveying and Mapping , (7) : 12~13.

[2]     Zhou S Q (1999) The trial of replacing second order level surveying with precise triangulated height surveying. WTUSM Bulletin of Science and Technology, (3): 25~29.

[3]     Pan S Q (1999) Atmospheric vertical refraction correct ionfortriangular altitude survey according to atmospheric temperature change rate. Journal of Hohai University, 27 ( 5): 12~16.

[4]     Jiang C G (1996) The theoretical studies and preliminary test on accurate calculation of precise trigonometric leveling. Surveying and Mapping of Sichuan , 19( 3) : 125~128.

更多相关推荐:
科技论文写作指导感想

《科技论文写作指导》学后感姓名:杨卫国学号:20xx3658班级:水利水电工程11-01班时光飞逝,不知不觉间《科技论文写作指导》课程已经结束了。在这几周的学习中,虽然我不能说我对科技论文写作了解得多深,但是通…

实验报告和科技论文写作的区别和联系

实验报告和科技论文写作的区别和联系摘要随着科学事业的日益发展,越来越多的学生步入研究生阶段进行深造,科技论文作为必要的毕业条件,体现了学生的基本素质和科研水平,本科毕业论文质量的高低是衡量本科教育教学成败的一个…

科技论文写作

科技论文写作科技论文写作是科学研究不可分割的一部分,好论文才有好结果,才有引用价值。不成文,便成仁,毫不夸张。一个研究结果只有在被别人使用时才有意义。而想被别人使用,文章必须能引起其他科学家的兴趣,而且得保证其…

科技论文写作的一般格式

科技论文写作的一般格式论文写作一般涉及有:题目、作者姓名和单位、摘要、关键词、引言、正文、结论、致谢、参考文献。。。。。。等等以上方面内容,但不一定每篇论文都要由以上内容,可视论文需要取舍,现分述如下:一、题目…

科技论文写作心得

短短几周的英语科技论文写作课程结束了,老师为我们做了详尽细致的讲解。科技论文是科学技术研究成果的书面表达形式。把自己科学研究的结果用科学论文的形式发表出来,向同行们介绍最新的进展并接受同行的批评或建议,是科学研…

关于邹教授对高质量科技论文写作与投稿讲座的总结

关于邹教授对高质量科技论文写作与投稿讲座的总结讲座时间:20xx-10-12晚上7:00~9:00参加人员:学工办主任伍主任、科技协会全体全体会员、志愿者协会、能源学院全体新生讲座概述:讲座主要是讲述高质量科技…

科技论文写作

毕业论文抄袭的危害性分析——陈明20xx110474毕业论文是普通高校本科教学计划中最后一个综合性实践教育环节,也就是本科毕业生在大四时候需要完成的一项重要任务,这个有关到能否顺利毕业的,大学生必须完成论文才能…

研究生英语科技论文作业 范文

英语科技论文写作ENGLISHWRITINGOFSCIENTIFICPAPERS作业题目微合金化钢在板材轧制过程中热变形抗力的预测作者姓名黎原作者学号S120xx20xx30学科专业机械设计及理论指导教师牟德君...

科技论文写作格式范例

医学图像处理技术XXX华中科技大学生命科学与技术学院湖北武汉430074摘要随着医学成像和计算机辅助技术的发展从二维医学图像到三维可视化技术成为研究的热点本文介绍了医学图像处理技术的发展动态对图像分割纹理分析图...

科技论文

科技小论文生石灰煮鸡蛋巧儿齐召小学的六年级一班连文玉今天我在电视里看见一个科学实验是生石灰加水可以煮鸡蛋我想试一试可家里没有生石灰我只好出去买生石灰出了家门我去了商店商店里没有生石灰我问有没有与生石灰差不多的东...

科技论文写作A第1次作业

20xx20xx学年第二学期课程离线作业课程名称科技论文写作A第1次作业必填班级全称建筑工程管理班高专必填学号必填姓名必填西南交通大学网络教育学院直属学习中心二主观题共26道小题10科技论文写作A与科技论文写作...

科技论文的格式与主要部分写作要点

科技论文的格式与主要部分写作要点在科技期刊和学术会议论文中以通用型格式的应用最为广泛通用型格式的论文一般包括下列项目标题作者姓名及单位摘要及关键词前言正文结尾谢辞参考文献和附录下面我们对通用型格式论文中各部分的...

科技论文写作(51篇)