Passage 1 Feature of power generation

1. They electric power can stored.)

2. The power system is made up of 4 parts.

3. The unification of power system equipment is formed by 4 equipments.

4. A power system is an undivided integer.

5. The power network can operate normally without the integration of other 3 equipments.

6. A link line is called a transmission line.

7. A link line is formed by 3 power networks.

8. An electric power network is simply called a power network

9. The main network frame is formed by a weak EHV system.

10. The networks are not closely linked with each other

Passage 2 Types of circuit breaker

1. Contactors, are-extinguishing elements, insulation material and operating mechanism form the high

voltage circuit breaker.

2. The insulation structure is made up of 3 parts

3. The are-extinguishing medium can be divided into only 3 parts

4. An oil circuit breaker means a circuit breaker with oil as are-extinguishing and insulation

medium

5. A vacuum circuit breaker is not a circuit breaker with close and open contactors in high

vacuum

6. A pure SF6 gas is not a food are-extinguishing medium.

7. The insulation strength of SF6 gas is higher than air and vacuum.)

8. An oil minimum circuit breaker is very safe in use

9. An oil minimum circuit breaker has bad heat dissipation capability

10. An oil minimum circuit breaker is one of the mostly used circuit breakers in the power grid Passage 3 Optical fiber communication

1. A kind of information communication is optical fiber communication

2. The composite optical fiber ground wire is seldom used in power system

3. One of the transmission tasks of the optical fiber main network is to transmit administration telephones

from power system)

4. Optical fiber communication has been the important communication method in power communication

system

5. Large capacity of communication is not one of the advantages of optical fiber communication

6. The communication capacity of optical fiber is indirectly proportion to the carrier frequency

7. The carrier frequency of power line is more than 300kHz

8. The carrier frequency of microwave is between 3000Mha and 500MHz.

9. The main problem of the fiber-optic channel is the high price of fiber-optic equipmen

10. The cables made by optical fiber are not expensive

Passage 4 Power plant

1. Base on energy conversion, power plants are divided into more than 7 categories

2. A power plant tries to transform energy source into electric power

3. The power plant generating electricity and supplying steam is called a co-generation plant.

4. A power net plan for short and medium term is one of factors in selecting a site )

5. Two important factors for a new plant plan are fuel supply and ash disposal

6. Environmental protection is less considered in building a new power plan

7. Water sources and transportation conditions are not needed to consider in selecting a new site

8. The total capacity in a newly scheduled plant arranges from 1200MW to 3600MW

9. The number of units exceeds more than six

10. The ranks of capacity should be limited within two

Passage 5Selection of metal material for the boiler in units of 1000MW grade

1. The 1000MW grade high-efficiency supercritical unit is designed and made in China

2. The temperature of main steam and reheated steam reach basically between 570 to 650℃

3. The tube wall temperature of superheater and reheater can reach more than 600 to 650 ℃

4. The tube wall temperature steam oxidation performance at tube inner surface is highly demanded

5. The anti-high temperature flue gas corrosion performance at tube outside surface is not highly

demanded6. The temperature limit of T91 for use is about 593℃

7. The temperature limit of T92 for use is less than 620℃

8. The temperature of austenite stainless steel for normal use is about 650℃

9. The temperature limit of austenite stainless steel is less than 700℃

10. Only heat-resisting steel can be adopted for use

Passage 6 The role of the condenser

1. A condenser is a heat exchanger removing the vaporization heat from the exhaust steam and condensing

the exhaust steam into water

2. It is suggested that the water should not be cooled below the saturation temperature3. The saturation temperature would not remove excess energy from the system and reduce the overall

efficiency

4. It is unnecessary to reduce the steam to water so that it can be pumped back through the system

5. The condenser does not control back-pressure at the turbine exhaust6. The important factor controlling the turbine backpressure is the temperature of the cooling water

passing through the condenser tubes7. The temperature of cooling water will increase its temperature between 15oF and 20oF as it passes

through the condenser.8. The terminal difference means the temperature difference between the cooling water and the turbine

exhaust steam

9. The temperature increase of the cooling water and the terminal difference depend on 3 factors.10. The exhaust steam temperature does not rely on the temperature of the cooling water which enters the

condenserPassage 7 Hydraulic structure

1. The type of dam for hydraulic power plant depends on many factors2. The main purpose of the dam safety monitoring is to discover the normality of dam in time

3. The equipment installed inside the dam is to discover the normality of dam in time.

4. Horizontal displacement is more important than vertical displacement

5. Temperature stress and strain are the two main monitoring items of dam

6. The monitoring method is the suitable points on the dam and its foundation.

7. Some monitoring devices are movable for periodical supervision.)

8. The monitoring result result shall be analyzed and studied by computers.

Passage 8 Heat treatment

1. The post-weld heat treatments have two main purposes

2. One of the purposes is to diminish the residual stress in the welded joints.

3. The other purpose is to improve the organization of the welded joints

4. The welding crack can be classified into 5 categories

5. To change the internal structure of the work piece is one of purposes for heat treatment

6. There are 5 kinds of steel heat treatment

7. The processes of heat treatment include 4 procedures.

8. The electric resistance furnace is not widely used9. Heat treatment furnaces are not composed of electric resistance furnace, combustion furnace and surface

更多相关推荐:
电力系统个人工作总结

时光如梭,当我意气奋发地跨入二十一世纪的时候,不知不觉中参加工作已满十五个年头。回首这些年的工作,有硕果累累的喜悦,有与同事协同攻关的艰辛,也有遇到困难和挫折时惆怅。现将这些年的主要工作总结如下:一、政治上坚定…

电力公司共青团20xx年工作总结

20xx年是辽河油田公司未上市企业的扭亏解困之年,也是电力集团公司应对挑战、共克时艰,实现持续有效健康发展的关键之年。我们按照上级党、团组织的要求,结合公司实际,20xx年共青团工作的总体思路是:完善管理机制突…

电力个人工作总结

-------年的工作已经基本结束,回顾这一年来的工作,我在公司领导及各位同事的支持与帮助下,严格要求自己,按照公司的要求,较好地完成了自己的本职工作。我带领----------公司全体员工始终坚持安全第一、预…

电力设计院业务流程信息化关键问题研究

电力设计院业务流程信息化关键问题研究摘要:随着市场经济的发展,电力设计行业的不断创新、改革,使我国综合能力提高,就发电设计行业而言,多数的电力设计院处在转型期,并接受这严峻的市场经济的考验,由于电力设计院的管理…

电力电子学习总结

研1105兖文宇s20xx0326电力电子学习总结在这半年的时间我们在韩老师的带领下将电力电子这门课系统的学习了一下,也可以说是总结。因为很多知识并不是新的,在本科的时候都已经涉及到。通过这半年的学习,不敢说有…

电力公司企业党风廉政建设总结

XX公司党风廉政建设总结今年以来,在公司党委和公司纪委的领导下,XX公司党支部严格落实中央《关于实行党风廉政建设责任制的规定》,贯彻中纪委十八届二次全会、XX省电力公司20xx年反腐倡廉工作会议,党风廉政建设和…

电力企业演讲稿

我和电厂一同成长尊敬的各位领导,各位同事:下午好!我是新入厂的大学生xx,我今天演讲的题目是“我和电厂一同成长”。作为进入公司工作不久的新员工,今天我想就我作为一名大学生如何在中国华电公司贵港电厂这块肥沃的土壤…

《电力公司员工奖惩办法(20xx版)》学习心得

《电力公司员工奖惩办法(20xx版)》学习心得省公司为了加强管理,完善制度,本着“(一)公开、公平、公正;(二)实事求是、依法依规;(三)精神鼓励与物质奖励相结合;(四)惩前毖后、治病救人。”四个原则制定了《员…

集镇电力电信规划模板B

3-5电力规划1、电力现状域内电力系统构成:电站总装机容量6700KW(大树电站、晒经电站、李子坪电站);35KV输电线路4条共18.0KM;10KV配电线路总长137.2KM;变压器共148台总容量为5960…

10kV配电线路电力电缆故障排查和防范方法探析

10kV配电线路电力电缆故障排查和防范方法探析【摘要】10kV配电线路是我国电力系统中的重要组成部分,占有很大的比例,在电力系统的发展过程中,发挥了重要的作用。社会经济的迅速发展,人们对电力用量的需求不断上升,…

关于开展20xx年度河南省电力特有工种技师考核和推荐工作的通知

关于开展20xx年度河南省电力特有工种技师、高级技师考核和推荐工作的通知现将20xx年度河南省电力特有工种技师和高级技师理论和技能成绩通知你们,并就20xx年度技师和高级技师考核推荐工作,提出具体要求,请按期完…

电力安全事故应急处置和调查处理条例学习体会

《电力安全事故应急处置和调查处理条例》学习体会通过学习《电力安全事故应急处置和调查处理条例》使我了解到了本《条例》的颁布出台的意义,那就是与2007年公布施行的《生产安全事故报告和调查处理条例》相辅相承。其中本…